O-I Australia appointed Dominion Industry for a major furnace rebuild. Dominion was tasked with the complete removal and refractory replacement of O-I’s main melter, regenerators, refiner, forehearths and associated distribution channels. The main melter crown has a supersized brickwork arch, with a span of more than 7m and a length of 22m.
Specialised engineering
It required the installation of 35,000 bricks and fabrication of specialised engineered arch centres and scaffold systems to support the 160 tons of material and personnel.
The regenerator housings were 12m high and 15m long, with approximately 200,000 bricks removed and replaced.
The regenerator crowns were also installed as a brick arch with internal crown formwork.
An infill checker pack was installed in both regenerators using 75,000 special-shaped bricks.
The project used a substantial amount of machinery and a workforce of more than 100 people.
31.01.2019, Glass International
Sollte der Inhalt oder die Aufmachung dieser Seiten fremde Rechte Dritter oder gesetzliche Bestimmungen verletzen, so bitten wir um eine entsprechende Nachricht ohne Kostennote. Ich garantiere, dass die zu Recht beanstandeten Passagen unverzüglich entfernt werden, ohne dass von Ihrer Seite die Einschaltung eines Rechtsbeistandes erforderlich ist. Dennoch von Ihnen ohne vorherige Kontaktaufnahme ausgelöste Kosten werden wir vollumfänglich zurückweisen und gegebenenfalls Gegenklage wegen Verletzung vorgenannter Bestimmungen einreichen.